YOUR_LOGO_HERE
Support: 1-800-EMS-TECH

Secure PCBA Quote in 3 Simple Steps

Eliminate Quoting Delays and Manufacturing Risks. Unsecured file sharing introduces IP risk. Your design files go straight to the factory.

1

Request Access

Fill out the form to receive a secure upload link

2

Sign NDA & Upload

Upload Gerber/BOM via our vault—no public cloud storage

3

Engineering Review

Receive your quote and preliminary DFM report

Zero-Access Promise

Your design files are uploaded DIRECTLY to the factory system. We do NOT store, access, or view your Gerber files.

Manufacturing Compliance & Standards

ISO 9001:2015
ISO 13485
ITAR Registered
1
Step 1: Secure Project Initialization

Initialize Secure RFQ

Enter your project details to begin the secure quoting process.

The Zero-Access Data Pipeline: How We Protect Your IP

Our technical architecture ensures your design files never pass through marketing hands. Direct. Encrypted. Traceable.

01

Project Initiation

Declare IPC parameters and NPI stage. No design files required at this step to avoid email security risks.

02

Legal & Encryption

System automatically issues legally binding NDA. After signing, an Encrypted Vault URL is generated automatically.

03

Direct-to-Factory Upload

Upload Gerber/BOM files directly to EMS factory cloud server via pre-signed URL. Marketing team has absolutely no access.

About Our Facility & Leadership

Silicon Valley-based manufacturing excellence with enterprise-grade security protocols.

[CTO SECURITY MANDATE]

Protecting your intellectual property (IP) is our top priority. Your Gerber files go directly to our factory servers via encrypted protocol, eliminating all third-party intervention. We have built our entire infrastructure around zero-access principles.

John Doe

Director of Engineering

Facility Specifications

  • Silicon Valley-Based Engineering Team

  • Automated SMT Lines with Advanced Inspection

  • ISO 13485 & ITAR Compliant Infrastructure

Silicon Valley Cleanroom EMS Facility

Certifications & Standards

ISO
ISO 9001:2015
Certified
IPC
IPC-A-610
Class 2 & 3 Capable
ITAR
ITAR
Compliant Infrastructure
DFM
Automated
DFM Analysis

Engineer-to-Engineer FAQ

Technical answers from engineers, not marketers.

Why can't I upload Gerber files directly on this page?

IP security is our top priority. Standard web upload forms pass through intermediate servers. Our Zero-Access process requires NDA signing first, then files are pushed directly to AWS S3/Factory Vault, eliminating leaks from intermediaries (marketers/agencies).

How long to receive quote and DFM?

With complete data, preliminary DFM analysis and standard PCBA quote will be sent within 24-48 hours.